BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//swoogo.com//NONSGML kigkonsult.se iCalcreator 2.41.90//
CALSCALE:GREGORIAN
UID:61396633-3830-4738-a531-623462646437
BEGIN:VEVENT
UID:aae6bd708c7a3b35118fa19c9ff4297968abc2e4@swoogo.com
DTSTAMP:20260602T182749Z
DESCRIPTION:Industrialized construction – including modular\, prefabricatio
 n\, and offsite manufacturing – is transforming how buildings are designed
  and delivered.\n\nBut success requires more than tools.\n\nIt requires EA
 RLY DECISIONS\, ALIGNED DELIVERY STRATEGIES\, AND FABRICATION-READY INFORM
 ATION.\n\nDFMA (DESIGN FOR MANUFACTURING AND ASSEMBLY) connects design\, c
 onstruction\, and manufacturing enabling teams to deliver projects faster\
 , safer\, and with greater certainty.\n\nBIMFORUM DFMA SYMPOSIUM @ NIBS NE
 W CONFERENCE CENTER IN WASHINGTON DC focuses on how to make DfMA work—CONS
 ISTENTLY AND AT SCALE.
DTSTART:20260930T040000Z
DTEND:20261001T040000Z
LAST-MODIFIED:20260602T182749Z
LOCATION:NIBS Headquarters\, 2121 K Street Northwest\, suite 800\, Washingt
 on DC\, DC 20037\, United States
SEQUENCE:0
STATUS:CONFIRMED
SUMMARY:BIMForum DfMA Symposium
TRANSP:OPAQUE
X-ALT-DESC;FMTTYPE=text/html:<p>Industrialized construction – including mod
 ular\, prefabrication\, and offsite manufacturing – is transforming how bu
 ildings are designed and delivered.</p>\n\n<p>But success requires more th
 an tools.</p>\n\n<p>It requires <strong>early decisions\, aligned delivery
  strategies\, and fabrication-ready information</strong>.</p>\n\n<p><stron
 g>DfMA (Design for Manufacturing and Assembly)</strong> connects design\, 
 construction\, and manufacturing enabling teams to deliver projects faster
 \, safer\, and with greater certainty.</p>\n\n<p><strong>BIMForum DfMA Sym
 posium @ NIBS new conference center in Washington DC</strong> focuses on h
 ow to make DfMA work—<strong>consistently and at scale</strong>.</p>
BEGIN:VALARM
UID:36643738-3030-4735-b265-643161373531
ACTION:DISPLAY
DESCRIPTION:Industrialized construction – including modular\, prefabricatio
 n\, and offsite manufacturing – is transforming how buildings are designed
  and delivered.\n\nBut success requires more than tools.\n\nIt requires EA
 RLY DECISIONS\, ALIGNED DELIVERY STRATEGIES\, AND FABRICATION-READY INFORM
 ATION.\n\nDFMA (DESIGN FOR MANUFACTURING AND ASSEMBLY) connects design\, c
 onstruction\, and manufacturing enabling teams to deliver projects faster\
 , safer\, and with greater certainty.\n\nBIMFORUM DFMA SYMPOSIUM @ NIBS NE
 W CONFERENCE CENTER IN WASHINGTON DC focuses on how to make DfMA work—CONS
 ISTENTLY AND AT SCALE.
TRIGGER:-PT15M
END:VALARM
END:VEVENT
END:VCALENDAR
